One Page Stone Veneer Installation Guide

Professional Guide for Residential and Commercial Projects

Created: January 2025 | Revised: October 2025 | Doc ID: STY-IG-DSVG

Core Steps

  • Plan stone color, pattern, and joint style. Build a mockup.
  • Measure square footage and add 10–15% waste.
  • Identify surface type: masonry, framed, interior, or exterior.
  • Apply waterproofing where required.
  • Blend from multiple pallets for color consistency.
  • Dry-lay starter course and corners.
  • Trim stones using Hardie, Chipper, or Hammer.
  • Mix MVIS Hi-Bond Mortar to creamy, non-sag texture.
  • Back-butter stones and test bond coverage.
  • Set from the bottom up, starting with corners.
  • Fill and tool joints with MVIS Pointing Mortar.
  • Wait 7 days before cleaning with Vana Trol or water.
  • Seal only if needed, using breathable sealers.
  • Control temperature and curing during extreme weather.
  • Inspect for uniform joints, tight bonds, and clean faces.
  • Correct loose stones, haze, or efflorescence promptly.
Common Pitfalls
Skipping waterproofing, weak mortar coverage, poor blending, and leaving acid residue.
###END###